Katie Mason

Recent Posts

CleanMed Conference Report

Posted by Katie Mason on Jul 6, 2017 10:00:00 AM

I recently attended the CleanMed Conference and Exposition in Minneapolis, Minnesota. This event, organized by Health Care Without Harm and Practice Greenhealth, “has gained a global reputation as the premier conference on environmental sustainability in the health care sector.”[1] This blog post will discuss the conference content as well as a few key points from several of the workshops I attended.  

Read More

Topics: Sustainability, Building Performance & Technology

Special Considerations for Hospital Operating Room Upgrades

Posted by Katie Mason on May 17, 2017 10:00:00 AM

Space upgrades are a necessity to ensure that older buildings remain safe, functional, and cutting-edge for the users. As part of my role as an owner’s project manager for a large hospital, one of my recent projects has been an upgrade to the finishes of several operating rooms. This post will discuss the coordination and construction effort involved for such a project, as well as some potential challenges.

Read More

Topics: Building Performance & Technology

Football Stadiums and Energy Efficiency. Fantasy?

Posted by Katie Mason on Dec 21, 2016 10:00:00 AM

Given that we're solidly into football season, we thought it was a good time to revisit this post by Katie from last year about stadium energy efficiency. Enjoy.


Originally Posted November 12, 2015

After recently attending a New England Patriot’s football game at Gillette Stadium in Foxboro, Massachusetts, I was overwhelmed by the size of both the structure and the population density served during the four plus hours that the game is taking place. The relatively new Gillette Stadium is also a completely open configuration located in a cold climate. Unsurprisingly, my thoughts immediately turned to energy consumption and sustainability.

Read More

Topics: Sustainability, Energy Efficiency

ASHE Construction in Healthcare Workshop

Posted by Katie Mason on Nov 10, 2016 12:00:00 PM

I recently attended the Health Care Construction (HCC) Certificate workshop in Seattle, Washington. This event, organized by ASHE (American Society for Healthcare Engineering) and WSSHE (Washington State Society for Healthcare Engineering), was directed towards contractors, facility managers and construction project managers in healthcare. ASHE offers many certifications, workshops and education opportunities for different audiences in healthcare. This post will discuss this workshop and a few points I found particularly important (there were many!). 

Read More

Topics: Standards and Metrics, healthcare

Ireland’s Energy Sources: How Green is the Emerald Isle?

Posted by Katie Mason on Sep 28, 2016 10:00:00 AM

Inspired by a recent vacation to Ireland, I was compelled to research Ireland’s energy sources and what forms of renewable energy they are utilizing. Ireland is not a large country (slightly smaller than Indiana, geographically) and is not densely populated with the exception of a few cities. My vacation toured the southwest/western coast as well as Dublin on the east coast. In this blog post, I will discuss what I learned about Ireland’s energy sources and how the country is utilizing renewable energy.

Read More

Topics: Sustainability, Public Policy

Construction of the 2016 Rio Olympics

Posted by Katie Mason on Aug 10, 2016 1:00:00 PM

While watching coverage of the 2016 Olympic Games in Rio de Janeiro, I started looking into what it took to create the venue which accommodates many of the events. Similar to every Olympic game, Rio had a short period of time to build the extravagant stadiums and the other venues required. In this post, I will discuss what it took to construct this venue and some challenges with this particular location. 

Read More

Topics: Sustainability, Public Policy

Construction Project Management Challenges in Healthcare Facilities

Posted by Katie Mason on Jun 22, 2016 11:36:49 AM

In a recent blog post, I shared my experience as an Owners’ Project Manager for a mechanical system upgrade in an office building for a large organization in Burlington, Vermont. This role has provided me with several new related projects in a healthcare facility, each varying in type and having a very different effect on the overall environment of the organization. In the healthcare environment, I have become familiar with its unique construction challenges. This post will discuss a couple of these challenges and approaches for preventing these challenges from adversely affecting the overall success of the project.

Read More

Topics: Workplace & People, healthcare

What is the Roof Top Unit Challenge?

Posted by Katie Mason on Mar 2, 2016 10:00:00 AM

Recently I researched the “Roof Top Unit Challenge” which was created by the U.S. Department of Energy (DOE). What is the Roof Top Unit challenge? Launched in January 2011, the DOE released a design specification or commercial RTUs (Roof Top Units) with capacities ranging between 10 and 20 tons. RTUs built to match this specification are expected to have reduced energy usage by as much as 50% compared to a code compliant RTU. There is a large dependency on the building type and location of the RTU in relation to amount of energy savings. Since January 2011, top performing RTU manufacturers are working to design units that meet this specification. In this post, I will discuss what it takes for a unit to be part of the RTU Challenge and which manufacturers have models that are designed to meet this performance specification. 

Read More

Topics: Energy Efficiency, Building Performance & Technology

A New Perspective as a Project Manager on a Mechanical System Upgrade

Posted by Katie Mason on Jan 8, 2016 10:00:00 AM

Over the past six months, I have been taking on a new role at Cx Associates as an owner’s Project Manager for a large organization in Burlington, VT. This has given me the opportunity to be part of a construction team - not as part of the commissioning firm, but rather by working for the owner in overseeing the project in its entirety. One of my current active projects is an HVAC mechanical upgrade in an office building known for occupant comfort issues. In this post, I will describe one of the difficulties we needed to overcome with this particular project, as well as a helpful tool that has been very useful for me as a Project Manager.

Read More

Topics: Building Cx & Design Review

Creating a Bid Document for a Ventilation VAV Retrofit

Posted by Katie Mason on Jul 1, 2015 12:00:00 PM

After completion of an ASHRAE Level 2 Energy Audit, a building owner is faced with the question of how to move on to the implementation phase of the identified energy saving opportunities. The audit report provides estimates for annual energy savings for each opportunity, as well as the simple payback to help determine if the measure is financially feasible. However, the audit does not design a measure in enough detail that a contractor can accurately bid or install the measure so that the savings are realized. Therefore we suggest that the building owner hire a technical consultant (designer or commissioning engineer) to develop a bid document that details the design of the measure. This technical consultant must understand the owner’s goals and expectations for the project.

Read More

Topics: Building Cx & Design Review, Energy Efficiency

Subscribe to Email Updates

Follow Us

Contact Us

cc© 2012-2017, Cx Associates. Content on the Building Energy Resilience blog is licensed under a Creative Commons Attribution-Noncommercial 3.0 United States License to share as much as you like. Please attribute to Building Energy Resilience and link to BuildingEnergyResilience

Creative Commons License may not apply to images used within posts and pages on this website. See hover-over or links for attribution associated with each image and licensing information.ads.