Spruce Camp Boiler Controls

Cx Associates collaborated with Mount Mansfield Company to meet Stowe Mountain’s goal of stabilizing and automating the Spruce Camp plant operation. During this project, we investigated the 10,600 MBH boiler and its associated equipment, including primary and secondary loops, loop pumps, and heat exchangers. We compiled data from field visits and trend data analysis to demonstrate the boiler's inefficiencies and generate solutions, and we identified and supported the implementation of changes that successfully met the project goals. 

Topics: Energy Management Existing Building hospitality problem solving

Jay Peak Resort Clubhouse

Cx Associates performed an RCx study for Jay Peak Resort’s two-story Clubhouse which includes functional space types such as a kitchen, bar and dining area, pro shop, golf cart storage, and overnight suites. This is a year-round building with varying levels of occupancy. Our review included the mechanical, domestic hot water, controls, and lighting systems and resulted in recommendations that would focus on the building automation system and fan coil units.

Topics: retrocommissioning Energy Management Existing Building hospitality

Middlebury College Bread Loaf Inn

Cx Associates completed construction and occupancy phase commissioning of a full renovation for the three-story, 60-plus-room Bread Loaf Inn. The renovation included winterizing the building with new mechanical equipment, an improved shell, and a commercial-grade kitchen. Our work uncovered a number of issues while the contractors were still onsite, resulting in minimized corrective costs and impact on the people and building systems.

Topics: commissioning Existing Building hospitality historical building

Spruce Peak Adventure Center

Cx Associates provided commissioning services for the construction of the Spruce Peak Adventure Center at Stowe Mountain Resort. We completed an in-depth review of the HVAC controls design and contractor’s scope work to identify and close existing gaps, resulting in a final, clear, agreed-to path forward for implementation of a complex controls package. As a result of our successful work on this project, we have been retained for several problem-solving projects with Stowe Mountain Resort.

Topics: commissioning New Construction hospitality design review

Hotel Vermont

Cx Associates provided commissioning services for this new waterfront boutique hotel which holds 126 guest rooms. Our early involvement in the project allowed us to identify design improvements that resulted in improved building performance and energy cost savings such as $10,000 first cost savings from a lower cost roof top air handling unit, 63,000 kWh and $8,000/year from variable speed pump installations, and 1,750 CCF and $2,500/year from separating the domestic hot water from the heat pump loop heating.

Cx Associates continued working with Hotel Vermont after occupancy to develop and test a new sequence of operations for the existing energy recovery unit (ERU) to reduce energy use and improve occupant comfort; this work was a direct result of observations made during the commissioning process.

Topics: commissioning Energy Management New Construction hospitality LEED Controls upgrade design review problem solving

Featured Projects