Cx Associates commissioned energy efficiency improvements at Burlington International Airport including the upgraded central chilled water system, replacement of two inefficient constant volume dual duct air distribution systems with a VAV system, extensive controls system programming upgrades, and lighting efficiency upgrades. CxA conducted design review for the central cooling plant and air system and heating plant upgrades. Many of our design review comments had a positive impact on system performance, especially part load operational efficiency. We estimate that our design review of the chiller plant controls alone saved the airport 150,000 kWh/year (20% of full load), worth $19,000/year. In addition, CxA worked with BTV to implement Building Performance Metrics and Monitoring to enable the building operators to maintain system performance over time.
Burlington International Airport
Topics: commissioning Existing Building bas design review state and municipal Client M&V
Vermont Air National Guard Fire-Crash-Rescue
Cx Associates provided lead commissioning services for a LEED Gold certified renovation and expansion of VTANG’s Fire-Crash-Rescue facility in South Burlington, VT. Our commissioning work with this high-performance building included mechanical and electrical systems, air and water source heat pumps, a geoexchange wellfield, and a 27.63kW PV array on the roof of the station. We developed and coordinated a Measurement and Verification Plan in compliance with LEED-NC 2.2 credit EA C5 to monitor all energy consuming systems through a DDC Base Meter Monitoring System (BMMS).