Cx Associates commissioned Unilever’s 36,600 SF Seventh Generation headquarters facility in Burlington, VT, which contains offices and labs. Commissioned systems included the heating, ventilation and air conditioning system (HVAC), domestic hot water, and lighting and lighting controls. The commissioning process included Owner’s Project Requirement (OPR) facilitation and two design reviews, along with full construction phase commissioning. The owner is pursuing LEED Gold certification (v4 ID+C Commercial Interiors) for this building.
Unilever Seventh Generation Renovations
Topics: commissioning Existing Building LEED design review OPR Facilitation Commercial and Industrial
Maine Medical Center Bramhall Campus
Cx Associates is commissioning this four-phase construction project, including the Congress Street Clinical Building, East Tower Vertical Expansion, Existing Visitor Garage Vertical Expansion, and Central Utility Plant Chiller. We are providing design, construction, and occupancy phase commissioning services for this project as well as occupancy phase monitoring-based commissioning. In addition, we worked with Maine Medical Center to develop an in-depth facilities Owner’s Project Requirements document that they are now using to inform other projects.
Topics: Healthcare commissioning New Construction LEED design review OPR Facilitation
University of Vermont Medical Center Miller Inpatient Building
Cx Associates led the development of the Owner’s Project Requirements (OPR), and then provided commissioning services for Design, Construction, and Post-Occupancy phases of the project. Our design reviews resulted in over $220,000 in first cost savings and we identified and suggested solutions for over 200 issues during construction.
Currently we are providing measurement and verification services in compliance with LEED 2009-NC Version 3.0 – EAC 5 for Measurement and Verification. This work includes commissioning metering devices, building a public-facing web page that charts the Energy Use Intensity of the building, writing and executing a measurement and verification plan, and developing an energy model to measure actual building energy performance in comparison to baseline.