Space upgrades are necessary to ensure that older buildings remain safe, functional, and cutting-edge for the users. As part of my role as an owner’s project manager for a large hospital, one of my recent projects has been upgrading the finishes of several operating rooms. This post discusses the coordination and construction effort involved for such a project, as well as some potential challenges.
This particular job involved installation of new flooring and wall panels, as well as demolition of the existing materials. The new system includes the following characteristics, all pertinent to an operating room environment:
When scheduling any project, the first step involves coordination with the staff who oversee the area. Due to the sensitivity of an operating room setting, this project was performed over two consecutive weekends for each room to minimize disruption to both patients and staff. Even on a weekend, closing an operating room, which is normally available for emergency cases, requires coordination and potentially a change in scheduling for the staff. Communication between all involved departments is a necessity for a successful project.
Although the construction itself is a relatively straightforward process when working with professional installers, there is still a lot of preparation work required before any construction can occur in a hospital. Most of the precautions taken are strictly with infection control and patient/staff/contractor safety in mind. From an infection control perspective, an operating room is an area that has the highest risk for patients; therefore certain precautions are required to ensure the safety and health of hospital patients during construction and after the project is complete.
Some examples of precautions during construction include:
Some examples of precautions after construction include:
One of the main challenges of this work is the possibility of finding something unexpected, which can occur during demolition of old walls and floors. Because there is limited time over a weekend, anything unexpected must be addressed immediately to allow for the room to be functional on Monday morning. Challenges can also occur if a contractor does not understand the hospital’s specific health and safety requirements and is not prepared to adequately meet the requirements. Having a contractor with hospital experience is invaluable in dealing with such time-sensitive surprises; otherwise there can be a negative impact on the schedule and serious consequences for patients and hospital staff.