Featured Projects

NYSERDA Largest Savers Impact Evaluation

Written by Rachael Straub | Dec 4, 2020 3:50:48 PM

Cx Associates provided engineering analysis for two projects as part of a census evaluation of the largest projects completed in the evaluation period for NYSERDA. The evaluation included onā€site M&V, delivery of engineering and attribution surveys by engineering staff and completion of rigorous verification of over 6,500 MWh of savings claimed on the two projects to determine the measure level and project specific gross and net savings realization rates with an enhanced degree of rigor.