Cx Associates provided peer-level design and construction phase commissioning of the mechanical, electrical, and plumbing systems for the YMCA's new, state-of-the-art facility in Burlington, VT. The building is made up of a gymnasium, natatorium, studios, fitness areas, childcare spaces, and offices, and uses water source heat pumps for heating and cooling with rooftop units (RTUs) and an HRV for ventilation. Our work focused on efficiency, first-cost and maintenance cost savings, and ensuring occupants would be comfortable in their spaces. For example, we found a lighting controller that required a fifteen minute wait time before the lights could be re-enabled after shut-down, a potential safety hazard. We worked with the design team and the contractors to find solutions to this and many other issues.